Construction Photos

Photos from various stages of construction. Click on the photos for larger images.

 

July 16, 2005

North Wing from parking garage. Drywall has been installed through the third floor; sliding glass doors on the first. Water heaters are being installed.

July 16, 2005

South Wing from parking garage. Siding has been installed on most parts; drywall through the third floor; sliding glass doors on the first floor. Water heaters are being installed.

July 16, 2005

North Wing from Newell Street. Drywall has been installed through the third floor; sliding glass doors on the first. Water heaters are being installed.

July 16, 2005

Connector

July 16, 2005

South Wing from Newell St. Drywall has been installed through the third floor; sliding glass doors on the first. Water heaters are being installed.

May 30, 2005

South Wing

May 30, 2005

North Wing

May 30, 2005

The walkway between 8045 and the parking garage has been paved (Eastern Village is in the background).

May 30, 2005

North Wing

May 30, 2005

Near corner of Kennett and Newell

May 30, 2005

Base for art glass wall. Note white covering on the first level of the building.

May 30, 2005

The driveway has been paved.

April 19, 2005

Shingles on both the South and North roofs. This picture shows both buildings near the connector.

April 19, 2005

A path has been plowed immediately adjacent to the public parking garage. This picture looks down along the side of the garage towards Kennett Street.

April 19, 2005

Balconies being installed on the South Wing on the corner that is closest to the North Wing and the public storage building.

April 19, 2005

Some windows have been installed in the North Wing.

April 13, 2005

Spreading dirt between 8045 and the parking garage

April 13, 2005

Some windows installed on South Wing facing Newell Street

April 13, 2005

Installing ductwork (probably insulated) in the South Wing

April 13, 2005

Shingles on the South Wing. The builders appear to be preparing to install windows (Tyvek installed around windows, platforms at base of building)

April 13, 2005

Tar paper on the North Wing

April 3, 2005

Tar paper on the South Wing

April 3, 2005

Shingles ready

April 3, 2005

Plywood on the North Wing

April 3, 2005

View from Newell and Eastern

March 13, 2005

March 13, 2005

March 13, 2005

March 13, 2005

March 13, 2005

February 13, 2005

February 13, 2005

February 13, 2005

January 29, 2005

January 29, 2005

November 18, 2004

November 3, 2004

November 3, 2004

November 3, 2004

November 3, 2004

November 3, 2004

September 11, 2004

April 10, 2004

April 10, 2004

 