July 16, 2005 |
|
North Wing from parking garage. Drywall has been installed through the third floor; sliding glass doors on the first. Water heaters are being installed. |
|
|
|
|
|
|
|
|
|
|
July 16, 2005 |
|
South Wing from parking garage. Siding has been installed on most parts; drywall through the third floor; sliding glass doors on the first floor. Water heaters are being installed. |
|
|
|
|
|
|
|
|
|
|
July 16, 2005 |
|
North Wing from Newell Street. Drywall has been installed through the third floor; sliding glass doors on the first. Water heaters are being installed. |
|
|
|
|
|
|
|
|
|
|
|
July 16, 2005 |
|
South Wing from Newell St. Drywall has been installed through the third floor; sliding glass doors on the first. Water heaters are being installed. |
|
|
|
|
|
|
|
|
|
|
|
|
May 30, 2005 |
|
The walkway between 8045 and the parking garage has been paved (Eastern Village is in the background). |
|
|
|
|
|
|
|
|
|
|
|
May 30, 2005 |
|
Near corner of Kennett and Newell |
|
|
|
|
|
|
|
|
|
|
May 30, 2005 |
|
Base for art glass wall. Note white covering on the first level of the building. |
|
|
|
|
|
|
|
|
|
|
May 30, 2005 |
|
The driveway has been paved. |
|
|
|
|
|
|
|
|
|
|
April 19, 2005 |
|
Shingles on both the South and North roofs. This picture shows both buildings near the connector. |
|
|
|
|
|
|
|
|
|
|
April 19, 2005 |
|
A path has been plowed immediately adjacent to the public parking garage. This picture looks down along the side of the garage towards Kennett Street. |
|
|
|
|
|
|
|
|
|
|
April 19, 2005 |
|
Balconies being installed on the South Wing on the corner that is closest to the North Wing and the public storage building. |
|
|
|
|
|
|
|
|
|
|
April 19, 2005 |
|
Some windows have been installed in the North Wing. |
|
|
|
|
|
|
|
|
|
|
April 13, 2005 |
|
Spreading dirt between 8045 and the parking garage |
|
|
|
|
|
|
|
|
|
|
April 13, 2005 |
|
Some windows installed on South Wing facing Newell Street |
|
|
|
|
|
|
|
|
|
|
April 13, 2005 |
|
Installing ductwork (probably insulated) in the South Wing |
|
|
|
|
|
|
|
|
|
|
April 13, 2005 |
|
Shingles on the South Wing. The builders appear to be preparing to install windows (Tyvek installed around windows, platforms at base of building) |
|
|
|
|
|
|
|
|
|
|
April 13, 2005 |
|
Tar paper on the North Wing |
|
|
|
|
|
|
|
|
|
|
April 3, 2005 |
|
Tar paper on the South Wing |
|
|
|
|
|
|
|
|
|
|
April 3, 2005 |
|
Shingles ready |
|
|
|
|
|
|
|
|
|
|
April 3, 2005 |
|
Plywood on the North Wing |
|
|
|
|
|
|
|
|
|
|
April 3, 2005 |
|
View from Newell and Eastern |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|